Tremco Sealants Logo

About Blog Resources Contact

search
Tremco Sealants Logo
search
  • Home
  • Markets
    • Commercial
    • Residential
    • Industrial
  • Case Studies
  • About
  • Blog
  • Find Your Sales Rep
  • Resources
    • Resource Center for Employees
    • Resource Center for Customers
    • Document Library
    • Submittal Builder
    • Technical Resources
    • Warranties
    • Continuing Education
    • Building Visualizer
  • Contact
  • Residential Contractor Information
  • Power of One
  • Warranties
  • 250GC
  • dymonic100
  • Industrial
    • Insulating Glass – Residential
      • IG Spacers
      • IG Sealants
      In-Plant Glazing – Commercial OEM
      • Extruded Products
      • Coatings
      • Tapes
      • Sealants
      • Adhesives
    • In-Plant Glazing – Residential
      • Polyurethane
      • Glazing Tapes
      • Silicone
      Modular
      • Air Barriers
      • Sealants & Adhesives
      • Mate Line Applications
      • Tapes and Foams
  • Residential
    • Residential Waterproofing Systems
      • TUFF-N-DRI
      • WATCHDOG
      • IMPAX
      • Horizon
      • Drainage & Protection Courses
      • TREMdri 160
      Methane Mitigation Systems
      • VaporLock
      Weather-Resistive Barrier Systems
      • EnviroDri
    • Dampproofing & Restoration
      • Dampproofing
      • Restoration
      Window & Door Installation
      • Silicone
      • Polyurethane
      • Siliconized Acrylic Latex
      • Urethane Acrylic Latex
      • Styrenic Copolymer
      • Gunnable Foam
  • Commercial
    • Polyurethane-Methacrylate (PUMA) Technology
      • Vulkem EWS for Traffic Coatings
      • TREMproof PUMA for Below-Grade Waterproofing
      • Components
      Air Barrier Systems
      • Vapor-Permeable
      • Impermeable
      • Transitions
      • Associated Products
      Commercial Glazing Systems
      • Sealants
      • Glazing Tapes
      • Extruded Products and Molded Components
      Traffic Coatings
      • Pedestrian Coatings
      • Vehicular Coatings
      • Specialty Coatings
      • Under Tile Systems
      • Primers
      • Sealers
    • Sealants & Adhesives
      • Silicone Sealants
      • Hybrid Polyurethane Sealants
      • Urethane Sealants
      • Specialty Sealants
      • Adhesives
      • Primers
      Expansion Joints (Willseal/Tremco)
      • Horizontal
      • Vertical
      • Fire-Rated
      • Seismic
      • Accessories
      Transition Assemblies
      • Tapes and Foams
      • Preformed Extrusions
      Firestopping
      • Sealants
      • Intumescents
      • Mortar and Accessories
    • Methane Mitigation Systems
      • VaporLock
      Primers
      • Air Barrier Primers
      • Below-Grade Primers
      • Epoxy Primers
      • Non-Porous Surface Primers
      • Porous Surface Primers
      • Urethane Tie-In-Primers
      Architectural Wall Coatings
      • Associated Products
      Vegetated Roofs
    • Waterproofing Systems
      • Cold Fluid-Applied
      • Hot Fluid-Applied
      • Sheet-Applied Waterproofing
      • HDPE/Bentonite
      • Hybrid Waterproofing Systems
      • Drainage
      • Primers
      • Protection Courses
      • Reinforcing Materials
      • Waterstops
      • Associated Products
      • Crystalline Waterproofing
  • Home
  • Resources
  • Technical Resources
  • Case Studies
  • Waterproofing Systems
  • City of Brantford

City of Brantford
Brantford, ON

CHALLENGE:

A new water pumping station and holding reservoir needed to be up and running quickly to service an industrial park area that was experiencing tremendous growth. The timeline was considered by many to be impossible and there was a penalty clause for construction delays. The footprint of the building was 36,000 square feet, including the pumping station, clarifier tanks and a holding reservoir for containment which was 24 feet below-grade. As much of the concrete as possible needed to be placed and waterproofed before winter arrived.

The waterproofing material originally specified would have required a minimum wait of 14 days to allow the concrete to cure before application. To waterproof the complete envelope of the working pumping station including the split slab, the outside walls of the concrete tank and the roof, nearly 85,000 square feet of waterproofing membrane needed to be applied. The general contractor needed to find a way to "fast track" the job.


SOLUTION:

London Caulking and Installations had already completed two jobs with TREMproof 250GC fluid-applied elastomeric waterproofing membrane and knew that it enabled construction schedules to be dramatically reduced. Instead of having to wait for poured concrete to fully cure before application of the waterproofing, TREMproof 250GC could be applied to “green”, or damp concrete. It cures in four hours while allowing the concrete to cure to a higher quality material. In addition, no primer is necessary, thus eliminating a labor step.

Within 24 hours after the concrete mud slab was placed, the waterproofing was applied. TREMproof 250GC is now in the Master Spec for water treatment and sewage treatment facilities.


Building Type
Other

Product(s)
TREMproof 250GC

Sign up for our newsletter


Tremco Logo

Products
  • Commercial
  • Residential
  • Industrial
Resources
  • Resource Center for Employees
  • Resource Center for Customers
  • Document Library
  • Submittal Builder
  • Technical Resources
  • Warranties
  • Continuing Education
  • Building Visualizer
About
  • Blog
  • Case Studies
  • International
  • Careers
Contact
3735 Green Road
Beachwood, OH 44122
800.321.7906
LinkedIn Facebook Youtube

© 2024 Tremco CPG Inc.

Terms and Conditions Privacy Policy California Supply Chain Notice Terms of Use Cookie Policy